Customization: | Available |
---|---|
Type: | Rotor Parts |
Pump Model: | MD025-12, Bn1-6L, Bn2-6, Bn5-6L Bn10-6L, Bn17-6L, |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Spare parts Product name |
1. Suction casing 2. Discharge casing 3.Stator 4. Rotor 5. Rotating Parts 6. Stuffing Box Unit |
Reverse-engineering | FARO 3D Laser Scanning, Laser Alignment, Design model, Computational Fluid Dynamics CFD |
Material | ASTM, ANSI, SAE, UNS, DIN, EN, ISO, TOCT Cast iron / Cast steel WCB / SS304 / SS316 , Ni-Cr-Mo-Ti Steel SBBPF®, EPBPF®, VI, CB, PTFE, EH, VN |
Mould and Casting | Investment casting mould, Sand casting mould Investment Casting: Wax injection, Clusters assembly, Coating & Sanding, Dewaxing, Casting, Post cleaning, Heat treatment, Inspection |
Process | CNC machining, Auto lathe machining, Meter lathe machining, Wire cutting, EDM cutting, Gringding, Milling, Drilling, Screwing, Cutting, Stamping |
Surface treatment | Blacking, Polishing, Anodize, Chrome plating, Zinc plating, Nickel plating or other as requirements |
Inspection | Material certificate, Hydrostatic testing, Impeller static & dynamic balancing testing, Non-destructive testing(PT/ RT/ UT/ MT), 3D coordinator, Hardness tester, Roughness tester |
Certificate | ISO9001:2015, ISO14001:2004 |
Packing | 1. Small part, single packed then put into paper carton 2. Wooden crates suitable for shipping on the sea 3. We also consider customers' special needs for packing |
Delivery | 30days after receiving the deposit. |
Payment | 70%TT in advance and the balance is paid against the copy of B/L. |
Mode of transport | 1. Express 2. Sea freight 3. Air shipping 4. Land transport 5. Post |
FAQ |