Customization: | Available |
---|---|
Type: | Casing Cover |
Pump Model: | 3196/3175/3180/3185 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Spare parts Product name |
1.Pump casing, Casing cover, Impeller, Expeller, Side plate, Shaft, Bearing cover 2.Labyrinth ring, GAMMA seal deflector, Packing seal, Isolator 3.Exchange unit assembly, Bearing unit service kit, Dynamic seal service kit, Vent device, Oil breath, Seal water equipment SWE |
Reverse-engineering | FARO 3D Laser Scanning, Laser Alignment, Design model, Computational Fluid Dynamics CFD |
Material | ASTM, ANSI, SAE, UNS, DIN, EN, ISO, TOCT Cast iron, Wear-resistant cast iron, Cast steel, Stainless steel, Duplex SS, Cast alloy steel |
Mould and Casting | Investment casting mould, Sand casting mould Investment Casting: Wax injection, Clusters assembly, Coating & Sanding, Dewaxing, Casting, Post cleaning, Heat treatment, Inspection |
Process | CNC machining, Auto lathe machining, Meter lathe machining, Wire cutting, EDM cutting, Gringding, Milling, Drilling, Screwing, Cutting, Stamping |
Surface treatment | Blacking, Polishing, Anodize, Chrome plating, Zinc plating, Nickel plating or other as requirements |
Inspection | Material certificate, Hydrostatic testing, Impeller static & dynamic balancing testing, Non-destructive testing(PT/ RT/ UT/ MT), 3D coordinator, Hardness tester, Roughness tester |
Certificate | ISO9001:2015, ISO14001:2004, API Specification Q1 |
Packing | 1. Small part, single packed then put into paper carton 2. Wooden crates suitable for shipping on the sea 3. We also consider customers' special needs for packing |
Delivery | 30days after receiving the deposit. |
Payment | 70%TT in advance and the balance is paid against the copy of B/L. |
Mode of transport | 1. Express 2. Sea freight 3. Air shipping 4. Land transport 5. Post |
FAQ |